Inspection according to ISO 9001:2015 Management System
• Design of Valves and Equipment – Together with Petrolane Engineering, we carried out an inspection to detect malfunctions and damage to equipment, for subsequent repair.
• Inspection of Drilling equipment – Inspection according to API SPEC 7-1 and 7-2, API RP 7G, DS1 VOLUME 3 – Drill Stem Elements, DS1 VOLUME 4 – Drill Specialty Tools
• Dimensional Inspection – Dimensional Control on Petrolane manufacturing parts and equipment, as well as Dimensional Inspection on parts sent by the Customer. We highlight the use of a three-dimensional machine and profile projector with an accuracy of 0.0005 mm.
Dimensional Inspection according to ABNT NBR ISO/IEC 17025:2017 Management System
• Accreditation granted by Inmetro’s General Accreditation Coordination (CGCRE), which makes us participants in the Brazilian Calibration Network – RBC
Reengineering parts with a three-dimensional machine in Petrolane laboratory
Dimensional Inspection on Manufacturing Orifice Plates at Petrolane
Valve Disassembly and Design – Inspection and Fault Assessment
Assembly & Testing Area
Bunker / Pit – Hydrostatic & Gas Test • Capacity for valves with up to 30” passage diameter • *HPU – Max test pressure 30,000 PSI • Generation of electronic graphic chart • 4 cameras for monitoring and recording tests • Real-time remote monitoring • Dimensions: 3.6 x 2.6 x 2.5 m depth • Lifting capacity 5 tons. *Obs: Additional NewTesting & Flushing HPU w/ PC 2022
Manufacturing and Repair
of Straight Sections and
Measurement Sections
• RBC Dimensional Inspection (ISO or AGA)
• Plate Holder Repair
• Roughness Adjustment by Internal Honing
• Manufacture of Orifice Plates, Straight Sections and Zanker Conditioners
• Painting
• Conditioning for Long Term Storage
Clean room
(Construction Phase)
Features & Investments:
• Construction of the anteroom to avoid contaminants in the clean room.
• Acquisition of the air filtration system, known as HVAC (Heating, Ventilating and Air Conditioning) and COMPAR (Particle Comparator)
• Main activities:
Assembly and maintenance of hydraulic actuators
SCM assembly and testing support
Support for nationalization of some service together
• High level of control to obtain the minimum of impurities and interference in the process carried out inside the room. Positive pressure between 5 and 20 PA making it impossible for external air to enter the room.
Paint Booth
Dimension: 5.5 x 2.45 x 2.6 m
Synthetic Enamel, Enamel,
Polyurethane and Epoxy
Layer and roughness measurement
Humidity Control
Prepared for future expansion
Blasting Booth
Dimension: 6 x 2.3 x 2.4 m
Blasting Type: Steel Shot / Aluminum Oxide
Anchorage Standard: SA2 / SA3 according to applicable procedure
Climatization (Unit / Dew Point): instruments for measurement in the acquisition process
Valve Repair
• Structured base to perform 100% of the service in one location;
• Located in Macaé in the Novo Cavaleiros neighborhood;
• Integrated management systems ISO 9001, ISO 14001, API Q1;
• Global contract for services and parts for surface Choke Valves with Petrobras since 2012 (services and parts);
• Valve repair contract with MODEC;
• Valve repair contract with Cameron Valves;
• Submarine valve repairs have been carried out in Brazil since 2015.